• “一路”完成瓯海大道主体工程

    "One Road" : completing the construction of the main part of Ouhai Highway.

    youdao

  • 河床变干后进行大坝主体工程

    River will then be dry and workers can start on the dam central section.

    youdao

  • 基础施工直接控制着主体工程施工进度

    Piles foundation construction determines the progress of main projects.

    youdao

  • 穿越哥达铁路隧道阿尔卑斯山铁路新干线主体工程

    The railway tunnel through the Gotthard mountain constitutes the centrepiece of the New Railway Link through the Alps

    youdao

  • 厂区主体工程基本建成,厂收集系统进一步完善中。

    Currently, the major construction has been finished and the external collecting system is being streamlined.

    youdao

  • 文章如何保证主体工程内在质量几个控制要点进行了论述。

    This paper states several control essentials of how to assure the inner quality of principal project.

    youdao

  • 乌江洪家水电站主体工程监理招标严格按国家招标法进行。

    Tendering for supervision engineers in main civil projects of Hongjiadu Hydropower Station was strictly followed the state tendering and bidding law.

    youdao

  • 固体废物污染环境防治设施验收应当主体工程验收同时进行。

    The facilities for prevention and control of environmental pollution by solid waste shall be checked and accepted simultaneously with the main part of the project.

    youdao

  • 主要介绍北京地铁东单车站采用支承进行车站主体工程施工方法。

    The paper mainly describes the method of piling in pilot tunnel used in construction of the principal part of Dongdan Subway Station in Beijing.

    youdao

  • 段塞流捕集器13—1气田海南气体处理厂主体工程重要组成部分

    Slug Catcher are an important part in Hainan gas processing plant for Yacheng 13-1 gas field.

    youdao

  • 建设项目大气污染防治所需资金材料设备应当主体工程统筹安排。

    The funds, materials, and equipment as needed to affect the prevention of air pollution of construction projects should be included in the overall planning of the main parts of these projects.

    youdao

  • 配套建设的停车场()应当主体工程同步设计、同步施工、同步交付使用

    The auxiliary facilities of parking lots (garages) shall be designed, constructed and delivered for use synchronously with the principal project.

    youdao

  • 水电工程导流成败与导流标准选择密切相关,它直接影响主体工程建设

    The success and failure of river diversion for hydropower projects is closely related with the choice of diversion standards that directly affect the construction of main works.

    youdao

  • 大坝混凝土施工百色水利枢纽主体工程施工关键,施工时间短工程量相对较大

    The main dam concrete construction is the key of the Baise WRPP main body project construction. Its working term is shorter and the construction quantity is larger.

    youdao

  • 建设项目防治水污染设施必须主体工程同时设计,同时施工,同时投产使用

    The facilities for prevention and control of water pollution must be designed, constructed and put to use or into operation simultaneously with the main part of a construction project.

    youdao

  • 介绍两种情况下,官家冲副监测成果分析认为该坝应该主体工程同步进行监测。

    The monitoring results of Guanjiachong auxiliary dam are analyzed; and we think that it should be safety monitoring with intersubjective project in-phase for long.

    youdao

  • 以往有关核电站抗震安全性研究主要集中主体工程上,对其中辅助设备的研究比较薄弱。

    Before now the research on seismic safety of nuclear power generating stations focused into principal structures and was behind in equipments.

    youdao

  • 第四十一建设项目防治污染设施应当主体工程同时设计、同时施工、同时投产使用。

    Article 41. Installations for the prevention and control of pollution at a construction project must be designed, built and commissioned together with the principal part of the project.

    youdao

  • 港口建设项目安全设施环境保护设施,必须主体工程同时设计、同时施工、同时投入使用

    Safety facilities and environmental protection facilities for port construction projects shall be designed, constructed and put into use simultaneously with the principal parts of the projects.

    youdao

  • 建筑物附属工程台阶散水建筑小品围墙简易主体工程建筑不可缺少的一部分。

    The appurtenant works, such as steps, fountain, architectural sketch, enclosing wall, simple storehouse and other architectures, is indispensable to the main works.

    youdao

  • 港口建设项目安全设施环境保护设施,必须主体工程同时设计、同时施工、同时投入使用

    The security facilities and environmental protection facilities for port construction projects must by designed, implemented and put into use synchronously with the mainstay engineering.

    youdao

  • 第二十六建设项目防治污染设施,必须主体工程同时设计、同时施工、同时投产使用。

    Article 26. Installations for the prevention and control of pollution at a construction project must be designed, built and commissioned together with the principal part of the project.

    youdao

  • 随着能源需求量不断增加,矿山建设项目势必增加主体工程井巷建设一类比较特殊工程

    With the increasing demand for energy, mining construction - project is bound to increase, and its main project is a kind of special Engineering.

    youdao

  • 主体工程具有水土保持功能工程界定评价可以体现“预防为主,防治结合”的基本理念

    Boundary and assessment for major engineering with the function of soil and water conservation can reflect the basic idea of "prevention in the first place and integrating prevention with control".

    youdao

  • 高速公路水土流失空间表现沿高速公路呈离散型分布,在时间主体工程具有高度同一性。

    Soil and water loss showed discrete distribution along the expressway in space and have great identities with the construction of principal part in time.

    youdao

  • 本文介绍中海石油平台制造公司海南气体处理厂主体工程管线管件及设备保温所采用的施工工艺。

    With site supervision of ARCO engineers, China Offshore Oil Platform Fabrication Company has made significant improvements in the project.

    youdao

  • 万家寨水利枢纽主体工程开工以前监理测量队进驻工地承担着枢纽工程各项施工检测任务

    The inspect survey team has worked on building site and undertook the inspect surveying tasks of all levels of constructions of the project before beginning of WANJIAZHAI water control project.

    youdao

  • 万家寨水利枢纽主体工程开工以前监理测量队进驻工地承担着枢纽工程各项施工检测任务

    The inspect survey team has worked on building site and undertook the inspect surveying tasks of all levels of constructions of the project before beginning of WANJIAZHAI water control project.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定