2005年该矿对主井提升及运输系统进行了技术改造。
The hoisting and transport systems of its main shaft are reformed in 2005.
矿山主井提升系统是矿山生产的咽喉部分,一旦发生故障将会直接影响生产。
The main shaft hoisting system is the most important part in the mine, if some accidents happen in the mine hoisting system, the results is to affect production.
荫营煤矿主井提升设备不能满足生产要求,因此对设备的主胶带输送装置进行改造。
The hoisting device serving the main shaft of Yinying Mine is not able to meet the need of production, so it is necessary to make reform for the main belt conveying equipment of the hoisting.
提升机是矿井主要机电设备之一,确保其安全正常运转,提高工作效率,降低故障影响时间至关重要,文章介绍了潘一主井提升机出现深度指示故障后通过修改SD传动控制及PLC程序解决绞车位置跳变故障的一种快速有效的方法。
The paper introduces a speedy effective way how to solve winch location jump by modifying SD drive control and PLC program after main hoist of panyi coal mine hoists appears depth indication fault.
主要阐述了主井箕斗提升载荷的测试意义、此种测试技术的测试原理、测试数据处理方法等。
It mainly narrated the sense for testing the lifting load of main shaft, the testing principle of the technique, approach for processing the testing data etc.
主要阐述了主井箕斗提升载荷的测试意义、此种测试技术的测试原理、测试数据处理方法等。
It mainly narrated the sense for testing the lifting load of main shaft, the testing principle of the technique, approach for processing the testing data etc.
应用推荐