施工现场的道路、机具、材料、临时设施、供电线路、给排水管道等的布置和管理按承包商的规定进行。
All on-site roads, machines, materials, temporary facilities, power lines, water pipelines shall be laid out and managed according to CONTRACTOR requirements.
北京地铁在其新浪官微上表示说,在周三早间,多条地铁线路被迫延迟,部分地铁站点被临时关闭。
Several subway lines were delayed Wednesday morning, and some subway stations were temporarily closed, the Beijing subway said on its official Sina Weibo account.
伦敦的地铁非常乐于每天临时关闭一些站和线路来进行维护,所以一些快捷路线很有可能就不存在了。
The London Underground has the extra joy of having various stations and lines shut temporarily almost everyday for maintenance; so that quick route might not exist.
费率若因线路价格变化临时调整不作通知。另外拨打接入号时,手机运营商会从您的手机里扣本地费率或者包涵在手机套餐里。拨打一个电话平均接通时间为30秒。
Prices could change without notice, besides IWCALL rates, your mobile operator company will charge local rate for calling access number, ave. connection time for one call is 30 sec.
费率若因线路价格变化临时调整不作通知。另外拨打接入号时,手机运营商会从您的手机里扣本地费率或者包涵在手机套餐里。拨打一个电话平均接通时间为30秒。
Prices could change without notice, besides IWCALL rates, your mobile operator company will charge local rate for calling access number, ave. connection time for one call is 30 sec.
应用推荐