临时支座的拆除是先简支后连续结构体系施工过程中的关键工序之一。
The removal of temporary bearings is one of the key procedures in the construction of transforming a simply-supported bridge structure into a continuous one.
临时支座的拆除是先简支后连续结构体系施工过程中的关键工序之一。
The structure system transformation has been implemented by successive extending beam and demolishing temporary support.
本文介绍了金塘大桥非通航孔桥临时支座预压、安装技术,永久支座安装及灌浆技术。
This paper presents the prepressing and installation technology of the temporary support saddle, and the installation and grouting technology of the permanent support saddle.
方家寨大桥采用先简支后连续的施工方法,通过逐次接长连续梁、逐次拆除临时支座来实现结构体系转换。
The removal of temporary bearings is one of the key procedures in the construction of transforming a simply-supported bridge structure into a continuous one.
方家寨大桥采用先简支后连续的施工方法,通过逐次接长连续梁、逐次拆除临时支座来实现结构体系转换。
The removal of temporary bearings is one of the key procedures in the construction of transforming a simply-supported bridge structure into a continuous one.