• 系统成本最小化为目标确定了系统中瓶颈非瓶颈资源上的加工批量运输批量。

    Based on minimizing the system gross cost, optimum task lot and transfer lot sizes of bottleneck and non-bottleneck resources are determined.

    youdao

  • 确定确定性节点选择交替有效地解决瓶颈问题

    Alternating between a deterministic and a non-deterministic node selection effectively solves the bottleneck problem.

    youdao

  • 确定确定性节点选择交替有效地解决瓶颈问题

    Alternating between a deterministic and a non-deterministic node selection effectively solves the bottleneck problem.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定