以系统总成本最小化为目标,确定了系统中瓶颈与非瓶颈资源上的加工批量与运输批量。
Based on minimizing the system gross cost, optimum task lot and transfer lot sizes of bottleneck and non-bottleneck resources are determined.
确定与非确定性节点选择交替有效地解决了瓶颈问题。
Alternating between a deterministic and a non-deterministic node selection effectively solves the bottleneck problem.
确定与非确定性节点选择交替有效地解决了瓶颈问题。
Alternating between a deterministic and a non-deterministic node selection effectively solves the bottleneck problem.
应用推荐