• 而解决管道泥沙问题关键在于临界流速确定

    Solving sediment depositing in pipeline key of problem lied in determining non-depositing critical velocity of muddy water delivery in pipeline system.

    youdao

  • 而解决管道泥沙问题关键在于确定临界流速与之配套的工程技术措施

    Solving sediment depositing in pipeline key of problem lied in determining non-depositing critical velocity of muddy water delivery in pipeline system and corresponding technical measures.

    youdao

  • 作者采用模型试验方法研究了万家寨引黄工程高压输水管道泥沙过程形态,分析了临界不淤流速及管道堵等问题。

    Using hydraulic model, the writers studied the process and pattern of sediment deposit in high pressure water conveyance pipe of Wanjiazhai YRDP (Yellow River Diversion Project).

    youdao

  • 作者采用模型试验方法研究了万家寨引黄工程高压输水管道泥沙过程形态,分析了临界不淤流速及管道堵等问题。

    Using hydraulic model, the writers studied the process and pattern of sediment deposit in high pressure water conveyance pipe of Wanjiazhai YRDP (Yellow River Diversion Project).

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定