影响上游法尾矿坝安全的各种因素中,渗流场是极为重要的因素之一。
Among the factors affecting the safety of upstream method-tailing dam the seepage field is one of the most important.
对上游法尾矿坝垂直水平联合排渗系统,排渗效果的数值计算进行了研究。
The numerical computation of the result of vertical - horizontal combined seepage draining system of tailings dam built by up - stream method was studied.
本文对上游法修筑的尾矿坝的细粒泥层内超静孔隙水压力的积累和消散过程进行了分析。
The process of accumulation and dissipation of extra-static pore water pressure in fine-grained mud layer of tailings fill dam constructed by up-stream method is analysed.
上游法尾矿坝浸润线较高,大部分坝体处于饱和状态,地震作用下易发生液化流滑破坏。
The phreatic line is higher at upstream-type tailings dam and most of dams are in saturated state, thus easily leading to flow slide destruction under earthquake.
上游法尾矿坝浸润线较高,大部分坝体处于饱和状态,地震作用下易发生液化流滑破坏。
The phreatic line is higher at upstream-type tailings dam and most of dams are in saturated state, thus easily leading to flow slide destruction under earthquake.
应用推荐