• 文中介绍万家引黄工程南干线2施工方法,采用了“法”排除地下水

    In the paper, the construction technology of buried culvert in No. 2 tunnel in Wanjiazhai YRDP using well-point to discharge ground water, is adopted.

    youdao

  • 文中介绍万家引黄工程南干线2施工方法,采用了“法”排除地下水

    In the paper, the construction technology of buried culvert in No. 2 tunnel in Wanjiazhai YRDP using well-point to discharge ground water, is adopted.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定