• 2006年至2008年,中国关停小火电机组3421千瓦关闭煤矿6028处。

    Between 2006 and 2008, China has shut down inefficient thermal power plants with a total capacity of 34.21gw, and closed 6028 small coal mines.

    youdao

  • 具有千瓦机组核电站每年维修费用在1.35亿元人民币左右

    One with two million kilowatts of nuclear power plant units total annual maintenance cost would be about 135 million yuan.

    youdao

  • 西门子公司2004年伏,中国112座100万千瓦的超超临界发电机组未经动农,20经营。西门子盘踞了发电机市场一半以上的份额。

    Since 2004, China has begun construction on 112 ultra-super critical 1000 megawatt units and put 20 into operation, according to Siemens, which claims more than half the generator market.

    youdao

  • 利用提出方法计算江苏省千万千瓦风电基地可信容量研究虚拟机组参数风电可信容量影响规律。

    Additional research was carried out using the proposed model, including evaluation of wind credible capacity of Jiangsu wind power base and the study on the impact of virtual unit parameters.

    youdao

  • 1949年我国火电最大机组为1千瓦输电电压等级最高为220千伏,且全部外国设计制造

    In 1949, the largest thermal power unit of China was 10 MW and the highest transmission voltage was 220 kV, all designed and made by foreign countries.

    youdao

  • 5月15日,电力公司扩建千瓦发电机组正式营运

    May 15th, the additional generating set of 50000 kilowatt was put into operation regularly.

    youdao

  • 钢铁材料技术保证超临界火电机组万千瓦核电机组建设顺利进行的重要基础之一

    Further, steel technology is one of the most imperative fundamentals to ensure the development and construction of USC fossil fired power plants and advanced nuclear power plants.

    youdao

  • 本文介绍迄今我国超临界火电机组万千瓦核电机组方面研发进展和取得的成就,并与国外同类技术的研发水平进行了对比。

    This paper briefly introduced the state-of-the-art and achievement of steel technology used for USC fossil fired power plants and advanced nuclear power plants in China so far.

    youdao

  • 主要介绍了核电站千瓦级,不同无刷励磁方式下汽轮发电机组转子温度测量方法

    The measuring methods of generators' rotor according to different brushless excitation types in nuclear power plants of 1 000 MW are introduced.

    youdao

  • 关停小火电机组7210千瓦淘汰了一落后煤炭钢铁水泥焦炭产能

    We decommissioned small thermal power plants with a capacity of 72.1 million kW and eliminated a number of outdated coal, steel, cement and coke production facilities.

    youdao

  • 关停小火电机组7210千瓦淘汰了一落后煤炭钢铁水泥焦炭产能

    We decommissioned small thermal power plants with a capacity of 72.1 million kW and eliminated a number of outdated coal, steel, cement and coke production facilities.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定