• 大坝断面优化采用可行方向复合形法,设计变量目标函数相同条件下,二种方法取得几乎完全一致的结果。

    The feasible direction method and the complex method are used in the optimal design of dam section, with the same design variables and the objective function. They led to the same result.

    youdao

  • 大坝断面优化采用可行方向复合形法,设计变量目标函数相同条件下,二种方法取得几乎完全一致的结果。

    The feasible direction method and the complex method are used in the optimal design of dam section, with the same design variables and the objective function. They led to the same result.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定