• 全面地介绍了新疆吉林台一级水电站工程主厂房排架布置设计情况。

    The layout and design of the bent structure of Powerhouse of Jilintai No. 1 Hydropower Station were expounded in this paper.

    youdao

  • 吉林台一级水电站地处祖国西北边陲,大坝工程按抗9地震满足严寒气候条件设计

    The dam of Jilintai Hydropower Station I is designed with the specifications for the earthquake intensity of 9 and the severe cold climate.

    youdao

  • 消力池新疆喀什河吉林台一级水电站引水隧洞水力学模型试验提出一种新型能工型式。

    A new form of energy dissipater named suspended grid plunge pool is posed through the hydraulic model experiment of diversion tunnel in Jilintai first-or.

    youdao

  • 由此不仅可以保证一级水电站工程安全高山峡谷地区类似的水电工程高边坡稳定性研究提供了可借鉴经验方法。

    The research, not only ensures the safety of Jingpin Hydropower Station, but also provides some helpful experience to the stability research on high cutting slopes of similar projects.

    youdao

  • 滩坑水电站下游为国家一级保护水生动物保护区。

    The downstream reach of Tankeng Hydropower Station is a key protection area of Pelochely bibroni.

    youdao

  • 虎跳峡水电站大坝工程一级大型石坝

    The major dam of Hutiao Gorge Water-Power Station is first chop large scale earth and rockfill dam.

    youdao

  • 水电站位于湖南省沅陵县境内沅水一级支流酉水下游一个以发电为主,兼有航运等综合效益中型水电工程。

    Gaotan Hydropower Station is located at downstream of Youshui River - the primary tributary of Yuanshui River within Yuanling County of Hunan Province.

    youdao

  • 水电站位于湖南省沅陵县境内沅水一级支流酉水下游一个以发电为主,兼有航运等综合效益中型水电工程。

    Gaotan Hydropower Station is located at downstream of Youshui River - the primary tributary of Yuanshui River within Yuanling County of Hunan Province.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定