• Byun Young-Jin 出任松岛房地产协会主席,2005年松岛工程启动,他开始在这里出售房产

    Byun Young-Jin chairs the Songdo real estate association and started selling property here when the first phase of the city opened in 2005.

    youdao

  • 工程提前个月完工

    The first phase of the project was completed two months ahead of schedule.

    《新英汉大辞典》

  • 一期工程要求矿石直接入炉冶炼。

    The mined ore should be directly put into the smelting furnace.

    youdao

  • 目前公司工程建设完成

    At present, the company building the first phase of the project has been completed.

    youdao

  • 其中一期工程30专用生产设备

    One of a group of 30 works dedicated production facilities.

    youdao

  • 项目一期工程年接气能力350万

    Project Phase coherent capacity of 350 tons.

    youdao

  • 工程已经告一段落

    The first phase of the project has been completed.

    youdao

  • 盐化工程进入投料试车一周倒计时

    Saline into a project put to trial the first anniversary of the countdown.

    youdao

  • 向家坝、溪洛两电站为金沙江开发工程

    Xiangjiaba and Xiluodu hydroelectric stations will be the first stage works of developing the Jinshajiang River.

    youdao

  • 西铁一期工程已经获准进行,今年年底动工。

    Construction of the West Rail Phase I has been authorised and will start before the end of this year.

    youdao

  • 介绍广州南沙港区工程应用大型沉箱施工工艺

    The application of large caisson in Nansha Port Area Phase I Project of Guangzhou Port and the construction technology are introduced.

    youdao

  • 提出一期工程客流总量规模、站点乘降量换乘量等客流指标。

    The thesis also put forward the total scale of passenger flows and boarding and alighting scale and transfer scale.

    youdao

  • 1984年青藏铁路期工程-北京青海格尔木段建成通车

    The first section, from Beijing to Golmud in Qinghai Province, was completed in 1984.

    youdao

  • 机场跑道上海浦东国际机场工程重要工程项目之一。

    Runway is one of the most important projects in the first phase construction of Shanghai Pudong International Airport.

    youdao

  • 介绍黄骅港一期工程堤护面栅栏表皮混凝土脱落原因处理措施

    The causes and treatment measures of concrete peeling of the approach embankment facing barrier board in Huanghua Port Phase I Project are introduced.

    youdao

  • 工程汝一白坪段己建成通车,全部工程2006 年建成。

    The first stage engineering has been completed and the entire engineering will be completed in 2006.

    youdao

  • 治理深圳工程中,淤泥土层采用真空强度增长了50%以上。

    In the first phase regulation of Shenzhen river, the strength of soft mud is increased over 50% by using the vacuum preload compaction method.

    youdao

  • 阿布扎比沙漠中备受热“零碳工程”——马斯达尔城的期工程已经竣工

    The first phase of Masdar City – the highly touted zero-carbon project in Abu Dhabi's desertis complete.

    youdao

  • 工程建设主要包括监测分系统预警服务分系统、通信传输分系统等部分。

    The first phase project mainly involves monitoring subsystem, predicting, warning and service subsystem and communications and transmission subsystem, etc.

    youdao

  • 津湾广场项目已于2008年启动建设期工程预计2009年建成开业。

    Its construction was launched in 2008, and its first phase will be completed and put in operation in 2009.

    youdao

  • 分析平面布置特点简要介绍了工程进展情况展望第二工程

    It also analyzes the characteristics of plane layout and briefly introduces the progress of the first-phase of the project and looks forward to the second-phase of the project.

    youdao

  • 论述长洲水利枢纽一期工程导流标准、导流方案、导流建筑物布置设计

    The paper disserts the diversion standard, the diversion scheme, the layout and design of diversion structures etc.

    youdao

  • 工程有57座房子还有五个不同样板俱乐部会所所有配套设施

    Phase One consists of 57 homes, including five different models, a clubhouse and all the amenities.

    youdao

  • 皂河泵站南水北调东线第一期工程第六梯级泵站之一,位于江苏省宿迁市皂河镇

    Zaohe pumping station, locating at the north Zaohe County, Suqian City of Jiangsu Province, is one of the sixth cascade pumping stations in South-to-North Water Transfer East Line Project, Phase I.

    youdao

  • ABB已经2007-08期间恰尔苏古达工厂扩建期工程提供了整流器系统

    ABB has already supplied rectifier systems for phase one of the Jharsuguda plant expansion in 2007-08.

    youdao

  • 百货广场桩基托换工程深圳地铁期工程关键工点之一,其换轴施工环境复杂

    Pile underpinning of Baihuo Plaza with great underpinning force and complex construction environment is one of the important parts of Shenzhen Metro project.

    youdao

  • 结合南京地铁南北线工程,提出超浅覆土情况下水底隧道盾构施工应采取的工程对策

    Then, based on the Phrase One Project of Nanjing Metro North-South Line, some main methods dealing with the shallow underwater ground are provided.

    youdao

  • 重庆轻轨根据自身城市特点全国率先引进座式单轨技术,建成新线工程

    According to its own urban features, Chongqing Municipality has initially introduced the straddled-type monorail technology in the light rail construction and finished the first stage of Line Jiaoxin.

    youdao

  • 工程方案关键技术就是如何开凿深埋长隧洞,掘进机采用使得问题得到解决。

    The key technology of the first stage project is how to dig tunnels and this is to be solved by adopting excavators.

    youdao

  • 工程方案关键技术就是如何开凿深埋长隧洞,掘进机采用使得问题得到解决。

    The key technology of the first stage project is how to dig tunnels and this is to be solved by adopting excavators.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定