Local authority Comhairle nan Eilean Siar and the Stornoway Trust, which is involved in wind power projects, have concerns the cable will not be constructed.
The telescoping handle enabled us to run about without any back pains, and the auto-recoiling AC cable kept us from having to wind things up on our own once the job was done.