But post Macondo, Uncle Sam made MMR roll the rig back out of the way and close off the well before a flowtest could be completed (No longer a requirement).
The flowtest will show what is in the well, how much production will flow out, and how rapidly the well will clean itself up and be ready for connection to the nearby pipeline.