In the Aug. 23 memo, the DOE official responsible for supervising engineering at the facility, Gary Brunson, calls for Bechtel to be immediately removed as the design agent for the novel Waste Treatment Plant (WTP), which was supposed to begin operation last year.
Radiation is a threat to human health at every stage of the process, from uranium mining to plant operation (even in those new ultra-safe plants) to waste disposal.