"Immediate checks revealed that the augering operation was associated with construction activity on land about 13 metres (42ft) above the top of the tunnel, " it added.
Driven by a six-blade mahogany fan (see top picture) with a diameter of 9.1m, the tunnel was used to test full-sized aircraft prototypes like the Spitfire.
Craning our necks to see the front of our train nose out of a tunnel as the back of it enters, down below we spot the Trans-Canada Highway, laid on top of the original Big Hill track bed.