The discussion then turned to the topic of the impact on bomber industrial capabilities if the B-2 production line is shut down after 20 aircraft are manufactured.
The final topic of discussion was an examination of the charges of poor performance and manufacturing problems leveled against the B-2 program by a General Accounting Office (GAO) study.