The initial FAA statement required the overhead switch panel wiring to be inspected and repaired if needed within 90 days.
CNN: 'There could have been an explosion'
So yes, you basically get a switch that requires no wiring nor power (except for the receiving end)!
ENGADGET: Mitsumi exhibits micro-vibration power generator and batteryless RF switch (video)
应用推荐
模块上移
模块下移
不移动