The other four options include variations on replacing the road surface with asphalt, raising the kerbs, the installation of guard rails and the restoration of two lanes of traffic each way.
"At three of these locations our investigations concluded that the noise should be mitigated through the installation of low noise surfacing materials when the existing surface is worn out, in accordance with our maintenance policy, " said an agency spokesperson.