He said that's an easily reversible process once the weather passes: Purge the seawater out, pull the packer out and reinsert the drill string to begin drilling again.
Allen said that in preparation for the storm, crews had pulled the drill string out, put a plug known as a "packer" in the casing pipe and filled the riser with seawater so the pipe would be stable.