The work is expected to take two years with at least seven months of work on the runway surface expected to take place overnight.
BBC: Runway two day closures are 'inevitable'
Plastic matting is to be installed over the grass surface of the Land's End runway to allow flights to resume between the Isles of Scilly.
BBC: Plastic mats to strengthen Land's End runway
应用推荐
模块上移
模块下移
不移动