Even on a dry day, the MTA's 300 pumping rooms remove an estimated 13 million gallons of water from the tunnel network, just to keep the system dry enough to run.
The Thames Tideway Tunnel will be the width of three London buses and will run for 20 miles from west to east London, connecting up the 34 of the most polluting sewer overflows.