-
The last new commercial reactor, run by the Tennessee Valley Authority, came online in 1996.
FORBES: Magazine Article
-
The last new commercial reactor, run by the Tennessee Valley Authority (nyse: TVC - news - people ), came online in 1996.
FORBES: The World's Most Nuclear Nations
-
It later submitted another analysis showing the reactor could run at 100 percent power, but the research found the risk of a tube break could reach unacceptable levels after 11 months.
NPR: San Onofre Submits Draft Linked To Restart Bid
-
Some of the suggestions include using molten lead as the coolant for the system, but the reactor would run at a temperature above 700 degrees C. when the material becomes corrosive.
FORBES: Thorium Nuclear Power -- A Lesson From Norway
-
Southern California Edison wants to change the plant's federal operating rules to permit the Unit 2 reactor to run at no more than 70 percent power, which company engineers and consultants believe will limit unusual tube wear.
NPR: San Onofre Submits Draft Linked To Restart Bid
-
Once he heard about the accident, he knew it was his duty to help, since so few people understood how to run reactor systems.
ECONOMIST: Cleaning up Japan��s nuclear mess
-
Mr. Norvelle said the four diesel generators at the plant, 40 miles northwest of Richmond, can furnish enough electricity to run vital safety systems indefinitely at the two-reactor site.
WSJ: Virginia Nuclear Power Plant Loses Power After Quake
-
Decaying generator tubes helped push San Onofre's Unit 1 reactor into retirement in 1992, even though it was designed to run until 2004.
NPR: San Onofre Submits Draft Linked To Restart Bid
-
With supplies continuing to fall and demand swelling on growing reactor-counts worldwide, the market will begin to tighten in the medium-run as deficits grow and become substantial, providing upside for uranium producers.
FORBES: Bullish On Uranium Despite Fukushima