It later submitted another analysis showing the reactor could run at 100 percent power, but the research found the risk of a tube break could reach unacceptable levels after 11 months.
NPR: San Onofre Submits Draft Linked To Restart Bid
应用推荐
模块上移
模块下移
不移动