The inquest heard the four-man crew used to relieve themselves over the side of the 58ft (17.7m) boat, which was built in 1974, and the bulwark and rail were lower than the recommended height.
In Wisconsin, the outgoing governor Jim Doyle claimed over 4, 700 jobs directly related to the high-speed rail line between Milwaukee and Madison would have been realized at the height of construction.