Sections of a drill which broke through the roof of a rail tunnel came from a construction site above the ground, accident investigators have found.
BBC: Construction drill came from site above rail tunnel
The Rail Accident Investigation Branch (RAIB) said the broken sections were part of an auger drill that had "penetrated the tunnel lining before falling on to the track".
应用推荐
模块上移
模块下移
不移动