• Given the two red flags that had been thrown up previously, one would have expected that as a precaution a cement plug would have been placed somewhere in the wellbore as a secondary pressure seal before this primary pressure control system (heavy mud) was evacuated from the wellbore.

    WSJ: The Oil Disaster Is About Human, Not System, Failure

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定