Columbia Sportswear said it didn't authorize this production, and cut ties with the Vietnamese factory soon after it found out about the practice.
WSJ: Apparel Retailers Confront Tough Options
Pre-assembling mounting gear with solar panels at a factory rather than at the job site, as is the typical practice, also will save money, he added.
FORBES: Report: Solar Panel Supply Will Far Exceed Demand Beyond 2012
应用推荐
模块上移
模块下移
不移动