That means that a 500, 000 sq ft facility would require 181 million sq ft of power generation or, converted to a ratio, each data center sq ft would require 362 sq ft of land.
FORBES: Can Solar Reduce The Impact Of Two High-Profile Data Centers? Amazon Engineer Weighs In [Updated]