With a gas turbine for a second stage, one is now operating at a 56% electrical efficiency and at natural gas pipeline stepdown substations, they operate at 60% efficiency.
FORBES: Who Sued Bloom Energy?
The fact is, there is simply no replacement for the efficiency, safety, and expansiveness of our pipeline system.
FORBES: Pipeline Infrastructure: Rhetoric v. Reality
应用推荐
模块上移
模块下移
不移动