That starts off with a "junk shot, " in which material such as rubber tires and golf balls is pumped into the shut-off valve, or blowout preventer, that sits atop the well.
He said in such a situation, normal procedure would be for the contractor's crew to secure the well by closing off the huge valve sitting on the seabed known as a blowout preventer.