Assuming a rated capacity per turbine of 5 MW, and a capacity factor (actual output) of 30%, we have 1.5 MW for each.
FORBES: The Heretic: Electric Cars Should Be Called Coal Cars
Big falls in construction output were a factor when the UK was last in recession in the first half of 2012.
BBC: Cranes in London
应用推荐
模块上移
模块下移
不移动