• To ensure the reliability of the electric grid after that date, TXU is planning on building 1500 megawatts of wind generation and is considering building multiple nuclear facilities, though these would not come on line by 2015 at the earliest--too late to resolve the looming power shortage.

    FORBES: Magazine Article

  • Likewise, Eidos of London, which makes games for PS2 and Nintendo consoles, has an outsized current-year multiple, perhaps based on the hopes it will repeat the success of its Laura Croft superwoman line.

    FORBES: Still time to score?

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定