To ensure the reliability of the electric grid after that date, TXU is planning on building 1500 megawatts of wind generation and is considering building multiple nuclear facilities, though these would not come on line by 2015 at the earliest--too late to resolve the looming power shortage.
FORBES: Magazine Article