Albert2's mega processing power convinced the team to not tread the costly and familiar path of a second wind tunnel to conduct their aerodynamic development.
The proximity of offshore wind in the the Atlantic Ocean to deep demand centers avoids the problems of moving power over long distances and significantly enhances the economic fundamentals of mega projects like those currently being considered in North Carolina.