-
The initial plan was to build a maximum of 417 turbines.
BBC: Fewer turbines for 'gigantic' Atlantic Array wind farm
-
Computer modeling allows today's auto engineers to precisely design vehicles, engines and transmissions, down to the smallest detail, for maximum strength without having to repeatedly build and test actual components over and over along the way, said Quinnell.
CNN: Fat and fast: High-performance gets big
-
At the moment, it is not clear whether the rhetoric is really a negotiating ploy, in which the administration blusters in order to build credibility and extract maximum concessions when the time comes to negotiate, or whether it wants to change international relations in some fundamental way.
ECONOMIST: Working out the world
-
His mission is to build a profitable business and run it at maximum velocity.
FORBES: The cable capitalist
-
The developers want to build between 189 and 339 turbines, with a maximum blade tip height of 204m, over a 295 sq km area.
BBC: 'No objection' call over Outer Moray Firth wind farm plans
-
The developers want to build between 189 and 339 turbines, with a maximum blade tip height of 204m, over a 295 square kilometre area.
BBC: Major offshore Moray wind project plans submitted
-
So whereas the nominal maximum width in an image is 20km, Pleiades can scan the ground rapidly to effectively build up a much wider swath at any given point.
BBC: Sharp-eyed Pleiades returns first pictures