By the time she was 30, Al-Tunisi was modernizing the Abqaiq oil processing plant in part by replacing thousands of manually operated valves with electric ones.
Hundreds of thousands of switches and circuit breakers must be operated manually, and the main transmission lines have little instrumentation to monitor the second-by-second flow of electricity from unpredictable new sources like windmills.