Next head to the mainring, where a typical timetable may consist of falconry displays, Cumberland wrestling, pipe-and-drum performances and pony-and-trap contests.
But the shut-down schedule also includes upgrades to all four of the LHC's detectors, the shielding of electronics, and even an overhaul of the ventilation system of the tunnel that houses the main accelerator ring.