It also includes the construction of highways and a continuous loop road surrounding the Olympic park to provide initial construction access and give vehicles venue access during the Games.
The savings are arrestingly simple: Redesigning a standard pumping loop in one factory saved 92% of the pumping power--with lower construction cost and better performance.