The report said that because of the layout of the rail line and signalling operators, anyone using the telephone line to discover if it was safe to cross could be told to wait up to 20 minutes.
Network Rail has upgraded power supplies and signalling systems and lengthened 41 platforms at 12 stations on the Midland main line north of London to accommodate the new trains which are nearly 270 yards (250m) long.