Each of the software-controlled hydraulic rams can deliver a force of 20 tonnes, giving the rig the ability to mimic the effects of different types of train.
Sources close to the investigation tell Forbes that Transocean engineers had last checked the blowout preventer 10 days before the rig explosion, and that BP believes the device suffered a leak of hydraulic pressure, preventing it from being able to shut the well.