The pressure in the capped-off well could blow a new hole in it, letting oil and gas leak out through the seabed.
ECONOMIST: BP and the gulf
But Tepco said melting fuel rods had created a hole in the chamber, allowing 3, 000 tonnes of contaminated water to leak into the basement of the reactor building.
BBC: Japan nuclear: Tepco halts Fukushima cooling plan
应用推荐
模块上移
模块下移
不移动