The Rest and Be Thankful section of the A83 has been closed six times in the past five years after heavy rain washed tonnes of debris down the hillside.
Making that wide palette fit with a solid rhythm section, and doing so without teetering on the top-heavy, requires a composer skilled in the art of collective bargaining.