In all, 1.1m tonnes of earth and rock were excavated in the construction of the 2010 course, flattening out the harsh gradients of the back nine, and using the aggregate to raise the opening holes above the level of the Usk's flood plain.
BBC: Countdown under way to Ryder Cup