• First of all, the helicopter is actually anchored to the ground during installation, so the spool must be engineered properly to avoid any significant tension in the line or the helicopter will be in jeopardy, especially in unstable weather conditions.

    FORBES: Startup Aims To Install Pipelines With Helicopters...Seriously!

  • Positioned on open ground between two Finnish lakes, these geometric structures will have the overall appearance of a stark minimalist installation rather than conventional buildings.

    ECONOMIST: Building design

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定