Inside the riser pipe is a space about half a meter in diameter, large enough to hold the spinning drill pipe and bit and to allow the return flowof drilling fluid.
At that depth stopping the flow with a deadweight of drilling fluid should create few problems, once the exceedingly difficult challenge of hitting the well is met.