The utility pre-emptively shut down six electricalswitching stations Monday as a precaution against flooding, cutting power to 500, 000 residents, Ms. Muzikar said.
Across the street was an electricalswitching station and, beyond that, an elevated segment of superhighway, still under construction, ending abruptly in the air.