The Stoke-on-Trent player hit a 170 checkout during the match and missed a shot at double 12 for a nine-dart finish in the final leg of the match.
BBC: Imperious Taylor wins Grand Slam
The Operations and Checkout building will soon serve as the final assembly facility for the Orion capsule during NASA's next phase of space exploration, the Constellation program.
FORBES: NASA Shuttle Exclusive
应用推荐
模块上移
模块下移
不移动