-
The World Trade Center site's design includes elements that should help protect against flooding, but the Port Authority is re-evaluating that design because of Sandy, Mr. Plate said through a spokesman.
WSJ: Protecting 9/11 Artifacts From Floods
-
So, do yourself a favor and tap into FREE high-end social media page design with Newtek, The Small Business Authority.
FORBES: As a Business Owner, Which Social Media Platform Should You Use?
-
"We have reached the evaluation that the D-1 area of crushed rock in the premises of the Tsuruga power plant needs to be taken into consideration from the perspective of quake-resistant design, " Kunihiko Shimazaki, deputy chairman of the authority, told reporters during a news conference following a panel meeting where the report was approved.
WSJ: Panel: Active Fault Runs Beneath Japan Reactor
-
Port Authority Assistant Director of Media Anthony Hayes said the original design included a radome -- short for radar dome --but that was rejected because of anticipated servicing and maintenance difficulties.
CNN: SHARE THIS