The plastic will then be shredded locally and sent to a UK reprocessor where it will bewashed, cut up into smaller flakes and melted down ready for manufacture into new products.
Kevin Rudd, project manager for the Tombstone pipeline, said the repaired pipeline needs to be shored up or it surely will bewashed away when the monsoon rains return next month.
The new set-up would be a professional catering kitchen and designed so dirty dishes came in to be stacked, washed and dried, and then moved round to the preparation area where meals were made and served, he added.